Home / Services
Service catalogueEvery approval an industrial project needs.
60 services across nine regulators — each available on its own, or bundled into a single mandate. Timelines shown are typical ranges; the regulator's workload and the completeness of documents decide the actual time.
Pollution-control consents
Consents and authorisations under the Air and Water Acts, filed and followed on the CECB online system.
Consent to Establish (CTE)
Prior consent before construction — for new units, expansions and amendments.
Consent to Operate (CTO)
Consent to start and continue operation, with renewal filed well before expiry.
CTE / CTO amendment
Changes in product mix, fuel, raw material or configuration within sanctioned limits.
Hazardous Waste Authorisation
Generation, storage and disposal of hazardous waste under the Hazardous and Other Wastes Rules, 2016.
Bio-Medical Waste Authorisation
For hospitals and healthcare facilities, including tie-up with a common treatment facility.
Name change in consents
Transfer of valid consents to a new legal name or owner without disturbing the approval.
Environmental Clearance
Prior Environmental Clearance under the EIA Notification, 2006 for Category A, B1 and B2 projects. For EIA studies, ITFC acts as the promoter's coordinator alongside the empanelled EIA agency, reviewing and monitoring the work.
Environmental Clearance — A / B1 / B2
End-to-end application on PARIVESH, from category assessment to grant.
Form-1, PFR and Terms of Reference
Pre-feasibility report and Form-1 prepared to Ministry guidelines for ToR approval.
EIA coordination, review and monitoring
We coordinate the study alongside the empanelled EIA consultant — reviewing the baseline data, EIA / EMP report and public-hearing process, and monitoring progress to deadline.
EC compliance reports
Half-yearly compliance reports against every EC condition, filed on time.
EC amendment and transfer
Amendment for changes in scope or configuration, and transfer on change of ownership.
Water permissions
Groundwater and surface-water permissions for industrial, mining and infrastructure use.
CGWA groundwater NOC
NOC for groundwater abstraction across all withdrawal slabs, including semi-critical and over-exploited areas.
CGWA exemption for micro and small units
Exemption route for eligible MSMEs below the prescribed withdrawal limit.
Surface-water allotment
Allotment of surface water from the State Irrigation / Water Resources Department.
Groundwater MoU and water management
MoU, rainwater harvesting, recharge and groundwater management plans.
Land and site
Industrial land and the site approvals that come before construction.
CSIDC land allotment
Allotment in developed industrial parks, from the land bank, or of revenue land.
Bank NOC from CSIDC
NOC to mortgage leasehold industrial land to the financing bank.
Building-plan approval
Approval of the factory building plan before construction begins.
Industrial licences and registrations
The licences and registrations that make an industrial enterprise lawful and eligible for incentives.
Factory licence
Fresh licence, renewal and name change under the Factories Act.
IEM Part A and Part B
Industrial Entrepreneur Memorandum filings with DPIIT.
Production certificate
Production and production-continuity certificates, and name changes.
Udyam and Udyam Aakanksha
MSME registration and the State's investment-intention registration.
Company, GST and IEC
Company and partnership formation, GST registration and the Import-Export Code.
Company-law compliance
Annual filings and statutory compliance for the operating company.
State incentives
Every benefit an investment qualifies for, planned at the project-report stage and pursued to disbursement.
Capital investment subsidy
Subsidy on eligible fixed capital investment.
Interest subsidy
Reimbursement of interest on term loans for eligible units.
Stamp duty and electricity duty exemption
Exemptions on land and lease documents and on electricity duty.
Mandi tax and project report subsidy
Mandi fee relief for eligible agro units and reimbursement of project report cost.
Quality and export incentives
Quality certification subsidy and export freight subsidy.
Thrust and high-priority sector certificates
Certification that unlocks enhanced incentive rates.
Environmental studies and monitoring
The technical work behind the applications and the compliance that follows.
Environmental audit and management plans
Audits, environment management plans and self-assessment studies.
Monitoring through NABL-accredited laboratories
Stack, ambient air, noise, water, wastewater, soil and hazardous-waste analysis.
Effluent treatment design
ETP design, commissioning support and performance evaluation of pollution-control equipment.
Waste, green belt and emergency plans
Solid and hazardous-waste plans, green-belt design, on-site and off-site emergency plans.
Carbon credits and decarbonisation
Emission-reduction work that builds on our Clean Development Mechanism practice, begun in 2003.
Carbon credit projects
Identifying, documenting and registering emission-reduction projects that earn tradeable carbon credits.
Decarbonisation study
Emissions and energy baseline, costed abatement options and a phased roadmap to cut emission intensity.
GHG inventory and internal audit
Scope 1 and 2 accounting and an internal audit of data and methods, ahead of third-party verification and emission-intensity targets.
Project advisory and finance
Project selection, technology tie-up, DPR and PFR, TEV studies, debt syndication, restructuring, valuation and project monitoring.
Six ways to engage ITFC.
Bundles scaled from micro units to mega projects. Each can be tailored; fees are quoted after we review the project.
Greenfield Turnkey
New plant, land to commissioningOne mandate for a brand-new unit, sequenced so construction never waits on a permission.
- Company and MSME registration
- CSIDC land allotment
- CTE, EC and water permissions
- Building plan and factory licence
- CTO and incentive registration
Statutory Clearance Pack
All environmental approvalsEvery pollution-control and environmental approval on one coordinated filing track.
- CTE and CTO
- Environmental Clearance
- CGWA groundwater NOC
- Hazardous-waste authorisation
Project Finance Pack
Report to sanctionThe project report and the finance, prepared together so the lender and the regulator see the same project.
- Detailed Project Report
- TEV study
- Debt syndication and working capital
Incentive Maximiser
IDP 2024–30 benefitsEvery subsidy and exemption the investment qualifies for, pursued to disbursement.
- Eligibility mapping at DPR stage
- Thrust-sector certification
- Claims through sanction and release
Expansion Pack
Adding capacity or productsWhat an operating plant needs to grow lawfully — and the fresh incentives growth unlocks.
- Expansion CTE / CTO
- EC amendment
- Revised factory licence and water NOC
- Incentives on expansion
Annual Compliance Retainer
For running plantsOne compliance calendar so nothing lapses: renewals, reports and regulator coordination.
- Consent renewals before expiry
- Half-yearly EC reports
- Monitoring and returns
- Notice and inspection support
Not sure which approvals apply?
Send us the product, capacity and location. We will tell you which permissions apply and the order to file them in.