Home / Services

Service catalogue

Every approval an industrial project needs.

60 services across nine regulators — each available on its own, or bundled into a single mandate. Timelines shown are typical ranges; the regulator's workload and the completeness of documents decide the actual time.

Chhattisgarh Environment Conservation Board (CECB)

Pollution-control consents

Consents and authorisations under the Air and Water Acts, filed and followed on the CECB online system.

Consent to Establish (CTE)

Prior consent before construction — for new units, expansions and amendments.

CECB · typically 1–3 months

Consent to Operate (CTO)

Consent to start and continue operation, with renewal filed well before expiry.

CECB · fresh, renewal, expansion

CTE / CTO amendment

Changes in product mix, fuel, raw material or configuration within sanctioned limits.

CECB · typically 3–6 weeks

Hazardous Waste Authorisation

Generation, storage and disposal of hazardous waste under the Hazardous and Other Wastes Rules, 2016.

CECB · usually filed with the CTO

Bio-Medical Waste Authorisation

For hospitals and healthcare facilities, including tie-up with a common treatment facility.

CECB · BMW Rules, 2016

Name change in consents

Transfer of valid consents to a new legal name or owner without disturbing the approval.

CECB
MoEF&CC · SEIAA · PARIVESH

Environmental Clearance

Prior Environmental Clearance under the EIA Notification, 2006 for Category A, B1 and B2 projects. For EIA studies, ITFC acts as the promoter's coordinator alongside the empanelled EIA agency, reviewing and monitoring the work.

Environmental Clearance — A / B1 / B2

End-to-end application on PARIVESH, from category assessment to grant.

MoEF&CC / SEIAA

Form-1, PFR and Terms of Reference

Pre-feasibility report and Form-1 prepared to Ministry guidelines for ToR approval.

First stage of EC

EIA coordination, review and monitoring

We coordinate the study alongside the empanelled EIA consultant — reviewing the baseline data, EIA / EMP report and public-hearing process, and monitoring progress to deadline.

Category A and B1

EC compliance reports

Half-yearly compliance reports against every EC condition, filed on time.

Every six months

EC amendment and transfer

Amendment for changes in scope or configuration, and transfer on change of ownership.

MoEF&CC / SEIAA
Central Ground Water Authority · Water Resources Department

Water permissions

Groundwater and surface-water permissions for industrial, mining and infrastructure use.

CGWA groundwater NOC

NOC for groundwater abstraction across all withdrawal slabs, including semi-critical and over-exploited areas.

NOCAP portal · fresh and renewal

CGWA exemption for micro and small units

Exemption route for eligible MSMEs below the prescribed withdrawal limit.

CGWA

Surface-water allotment

Allotment of surface water from the State Irrigation / Water Resources Department.

State department

Groundwater MoU and water management

MoU, rainwater harvesting, recharge and groundwater management plans.

Compliance support
Chhattisgarh State Industrial Development Corporation (CSIDC)

Land and site

Industrial land and the site approvals that come before construction.

CSIDC land allotment

Allotment in developed industrial parks, from the land bank, or of revenue land.

CSIDC

Bank NOC from CSIDC

NOC to mortgage leasehold industrial land to the financing bank.

CSIDC

Building-plan approval

Approval of the factory building plan before construction begins.

Local authority
Industrial Health & Safety · DPIIT · Directorate of Industries · MCA

Industrial licences and registrations

The licences and registrations that make an industrial enterprise lawful and eligible for incentives.

Factory licence

Fresh licence, renewal and name change under the Factories Act.

Industrial Health & Safety

IEM Part A and Part B

Industrial Entrepreneur Memorandum filings with DPIIT.

DPIIT

Production certificate

Production and production-continuity certificates, and name changes.

Directorate of Industries

Udyam and Udyam Aakanksha

MSME registration and the State's investment-intention registration.

MSME / DOI

Company, GST and IEC

Company and partnership formation, GST registration and the Import-Export Code.

MCA · GST · DGFT

Company-law compliance

Annual filings and statutory compliance for the operating company.

MCA
Chhattisgarh Industrial Development Policy 2024–30

State incentives

Every benefit an investment qualifies for, planned at the project-report stage and pursued to disbursement.

Capital investment subsidy

Subsidy on eligible fixed capital investment.

IDP 2024–30

Interest subsidy

Reimbursement of interest on term loans for eligible units.

IDP 2024–30

Stamp duty and electricity duty exemption

Exemptions on land and lease documents and on electricity duty.

IDP 2024–30

Mandi tax and project report subsidy

Mandi fee relief for eligible agro units and reimbursement of project report cost.

IDP 2024–30

Quality and export incentives

Quality certification subsidy and export freight subsidy.

IDP 2024–30

Thrust and high-priority sector certificates

Certification that unlocks enhanced incentive rates.

Directorate of Industries
Technical environmental services

Environmental studies and monitoring

The technical work behind the applications and the compliance that follows.

Environmental audit and management plans

Audits, environment management plans and self-assessment studies.

Technical

Monitoring through NABL-accredited laboratories

Stack, ambient air, noise, water, wastewater, soil and hazardous-waste analysis.

Field and laboratory

Effluent treatment design

ETP design, commissioning support and performance evaluation of pollution-control equipment.

Engineering

Waste, green belt and emergency plans

Solid and hazardous-waste plans, green-belt design, on-site and off-site emergency plans.

Compliance documentation
Climate advisory · since 2003

Carbon credits and decarbonisation

Emission-reduction work that builds on our Clean Development Mechanism practice, begun in 2003.

Carbon credit projects

Identifying, documenting and registering emission-reduction projects that earn tradeable carbon credits.

CCTS offset mechanism · voluntary markets

Decarbonisation study

Emissions and energy baseline, costed abatement options and a phased roadmap to cut emission intensity.

Steel, cement, power and process units

GHG inventory and internal audit

Scope 1 and 2 accounting and an internal audit of data and methods, ahead of third-party verification and emission-intensity targets.

GHG Protocol · ISO 14064
Banks · financial institutions

Project advisory and finance

Project selection, technology tie-up, DPR and PFR, TEV studies, debt syndication, restructuring, valuation and project monitoring.

Project advisory & finance →

Engagement packages

Six ways to engage ITFC.

Bundles scaled from micro units to mega projects. Each can be tailored; fees are quoted after we review the project.

Greenfield Turnkey

New plant, land to commissioning

One mandate for a brand-new unit, sequenced so construction never waits on a permission.

  • Company and MSME registration
  • CSIDC land allotment
  • CTE, EC and water permissions
  • Building plan and factory licence
  • CTO and incentive registration

Statutory Clearance Pack

All environmental approvals

Every pollution-control and environmental approval on one coordinated filing track.

  • CTE and CTO
  • Environmental Clearance
  • CGWA groundwater NOC
  • Hazardous-waste authorisation

Project Finance Pack

Report to sanction

The project report and the finance, prepared together so the lender and the regulator see the same project.

  • Detailed Project Report
  • TEV study
  • Debt syndication and working capital

Incentive Maximiser

IDP 2024–30 benefits

Every subsidy and exemption the investment qualifies for, pursued to disbursement.

  • Eligibility mapping at DPR stage
  • Thrust-sector certification
  • Claims through sanction and release

Expansion Pack

Adding capacity or products

What an operating plant needs to grow lawfully — and the fresh incentives growth unlocks.

  • Expansion CTE / CTO
  • EC amendment
  • Revised factory licence and water NOC
  • Incentives on expansion

Annual Compliance Retainer

For running plants

One compliance calendar so nothing lapses: renewals, reports and regulator coordination.

  • Consent renewals before expiry
  • Half-yearly EC reports
  • Monitoring and returns
  • Notice and inspection support

Not sure which approvals apply?

Send us the product, capacity and location. We will tell you which permissions apply and the order to file them in.

WhatsApp us